  1. Question 1

    Single answer

    When deploying a VxRail cluster with an internal DNS server, where is the DNS server located?

    • A

      VxRail Manager VM

    • B

      vSphere Distributed Switch

    • C

      vCenter Server Appliance

    • D

      Standalone VM

    Reveal answer

    Correct answer

    • A

      VxRail Manager VM

  2. Question 2

    Single answer

    An administrator is trying to monitor vSAN backend IOPS, throughput, and latency in the vSphere Client. What must be turned on to monitor these metrics?

    • A

      vSAN Disk Management

    • B

      vSAN Performance Service

    • C

      vSphere Distributed Resource Scheduler

    • D

      vSAN Health Service

    Reveal answer

    Correct answer

    • B

      vSAN Performance Service

  3. Question 3

    Single answer

    Which deployed software component is used to collect real-time log activity for VxRail?

    • A

      vRealize Log Insight

    • B

      vCenter

    • C

      Internal tftp

    • D

      VxRail Manager

    Reveal answer

    Correct answer

    • A

      vRealize Log Insight

  4. Getting the hang of it? 287 more D-VXR-OE-02 questions are waiting, each with its answer. Unlock them all

  5. Question 4

    Single answer

    A VxRail administrator has been tasked with configuring static LAG for a VxRail cluster vSAN traffic. The ToR switches have already been configured.

    Which VDS port group load balancing option should be configured?

    • A

      Route based on physical NIC load

    • B

      Route based on originating virtual port

    • C

      Route based on IP hash

    • D

      Route based on source MAC hash

    Reveal answer

    Correct answer

    • C

      Route based on IP hash

  6. Question 5

    Single answer

    The vSphere Client is showing several failures on node 3. Support recommends opening an SSH session to troubleshoot. The connection fails to establish.

    Which path should be used to enable SSH on the host from vSphere Client?

    • A

      Cluster > Monitor > System > Services

    • B

      Host > Configure > VxRail > Enable SSH

    • C

      Cluster > Configure > VxRail > Hosts > Enable SSH

    • D

      Host > Configure > System > Services

    Reveal answer

    Correct answer

    • D

      Host > Configure > System > Services

  7. Question 6

    Single answer

    Where in the VxRail Plugin can log bundles be generated?

    • A

      Monitor > VxRail > Issues and alarms

    • B

      Configure > VxRail >Troubleshooting

    • C

      Monitor > VxRail > Security

    • D

      Configure > VxRail > Support

    Reveal answer

    Correct answer

    • B

      Configure > VxRail >Troubleshooting

  8. Question 7

    Single answer

    Which vSAN troubleshooting option provides improvement recommendations for the VxRail cluster?

    • A

      Skyline Health

    • B

      HCIBench

    • C

      Network Performance Test

    • D

      VM Creation Test

    Reveal answer

    Correct answer

    • A

      Skyline Health

  9. Question 8

    Single answer

    A systems administrator is tasked with upgrading the VxRail software. Which resource should the administrator use to plan the upgrade?

    • A

      MyVxRail

    • B

      ProSupport Services

    • C

      SolVe Online

    • D

      OpenManage Enterprise

    Reveal answer

    Correct answer

    • C

      SolVe Online

  10. Question 9

    Single answer

    Using the VxRail Manager, what information can be located under the node physical view?

    • A

      Location and PSNT

    • B

      Operational Node Status and Appliance ID

    • C

      Temperature and Health State

    • D

      Health State and Memory

    Reveal answer

    Correct answer

    • A

      Location and PSNT

  11. Question 10

    Single answer

    What is the VxRail evaluation period for vSphere and vSAN?

    • A

      30 days

    • B

      60 days

    • C

      90 days

    • D

      120 days

    Reveal answer

    Correct answer

    • B

      60 days

  12. Question 11 Locked Unlock to see this question
  13. Question 12 Locked Unlock to see this question

287 questions locked

Unlock all 297 D-VXR-OE-02 questions

You have tried 10 for free. The other 287 work the same way: answer first, then check.

Questions
297, each with its answer
Formats
Single answer
Version
6.0
Access
3 months from purchase

One-time payment

$149.00

Web-based practice exam Included Practise online in a real exam interface

Secure checkout